Challenge Overview
For this challenge, we'd like open the possibility to set end date for registration phase and submission phase.
Following rules applied to both launch new challenge wizard and challenge edit page.
Basically, we'd like to add one more date input for end date of registration phase.
1. For Design challenges except Design F2F challenge, Add an input similar as Round 1 Duration and Round 2 Duration to specify the length of registration phase, by default, the value should be following the definition in the template.
2. For Design F2F challenge, Add input for specifying the Registration End and Submission End.
3. For Develop challenges except F2F challenge, add an input for Registration End similar as Submission End.
4. For F2F challenge, show the Submission End, and add an input for Registration End similar as Submission End.
5. The registration end should be properly applied to phases generation for each challenge type.
6. The default length should be same as defined in phase templates.
Local Setup
- Please use the dev branch (commit 4acf5f5dadd5b9687e637e04a7129978c4c66fb8) for development.
- Please follow Build and Run with Docker compose to build and run direct app locally
- You can run the online review to check the challenge phases or directly check database.
- Verification Steps
- Winner Will be responsible to create the PRs for merge
Following rules applied to both launch new challenge wizard and challenge edit page.
Basically, we'd like to add one more date input for end date of registration phase.
1. For Design challenges except Design F2F challenge, Add an input similar as Round 1 Duration and Round 2 Duration to specify the length of registration phase, by default, the value should be following the definition in the template.
2. For Design F2F challenge, Add input for specifying the Registration End and Submission End.
3. For Develop challenges except F2F challenge, add an input for Registration End similar as Submission End.
4. For F2F challenge, show the Submission End, and add an input for Registration End similar as Submission End.
5. The registration end should be properly applied to phases generation for each challenge type.
6. The default length should be same as defined in phase templates.
Local Setup
- Please use the dev branch (commit 4acf5f5dadd5b9687e637e04a7129978c4c66fb8) for development.
- Please follow Build and Run with Docker compose to build and run direct app locally
- You can run the online review to check the challenge phases or directly check database.
Final Submission Guidelines
- Changes for direct-app for the new logic- Verification Steps
- Winner Will be responsible to create the PRs for merge